| 1 |
Cumulative, Total KWH |
kwh |
1 |
|
| 2 |
Cumulative, Rate-A KWH (Peak) |
kwh |
2 |
|
| 3 |
Cumulative, Rate-B KWH (Off Peak) |
kwh |
3 |
|
| 4 |
Cumulative, Total KVARH Leading |
kvarh |
4 |
|
| 5 |
Cumulative, Rate-A KVARH Leading (peak) |
kvarh |
5 |
|
| 6 |
Cumulative, Rate-B KVARH Leading (Off Peak) |
kvarh |
6 |
|
| 7 |
Cumulative, Total KVARH Lagging |
kvarh |
7 |
|
| 8 |
Cumulative, Rate-A KVARH Lagging (peak) |
kvarh |
8 |
|
| 9 |
Cumulative, Rate-B KVARH Lagging (Off Peak) |
kvarh |
9 |
|
| 10 |
Instantaneous Demand |
kw |
10 |
|
| 11 |
Instantaneous Voltage Phase A |
voltage A |
11 |
|
| 12 |
Angle Voltage Phase A |
Angle Voltage A |
A11 |
|
| 13 |
Instantaneous Voltage Phase B |
voltage B |
12 |
|
| 14 |
Angle Voltage Phase B |
Angle Voltage B |
A12 |
|
| 15 |
Instantaneous Voltage Phase C |
voltage C |
13 |
|
| 16 |
Angle Voltage Phase C |
Angle Voltage C |
A13 |
|
| 17 |
Instantaneous Current Phase A |
I A |
14 |
|
| 18 |
Angle Current Phase A |
Angle Current A |
A14 |
|
| 19 |
Instantaneous Current Phase B |
I B |
15 |
|
| 20 |
Angle Current Phase B |
Angle Current B |
A15 |
|
| 21 |
Instantaneous Current Phase C |
I C |
16 |
|
| 22 |
Angle Current Phase C |
Angle Current C |
A16 |
|
| 23 |
Instantaneous Power Factor |
P.F |
17 |
|
| 24 |
Maximum Demand |
K W (M) |
18 |
|
| 25 |
Cumulative Maximum Demand |
K W (C) |
19 |
|
| 26 |
Maximum Demand reset Date |
Date |
20 |
|
| 27 |
Maximum Demand reset Times |
Times |
21 |
|
| 28 |
Previous month Cumulative Total KWH |
kwh |
22 |
|
| 29 |
Previous month Cumulative Rate-A KWH (peak) |
kwh |
23 |
|
| 30 |
Previous month Cumulative Rate-B KWH (Off Peak) |
kwh |
24 |
|
| 31 |
Previous month Cumulative Total KVARH Leading |
kvarh |
25 |
|
| 32 |
Previous month Cumulative Rate-A KVARH Leading (peak) |
kvarh |
26 |
|
| 33 |
Previous month Cumulative Rate-B KVARH Leading (Off Peak) |
kvarh |
27 |
|
| 34 |
Previous month Cumulative Total KVARH Lagging |
kvarh |
28 |
|
| 35 |
Previous month Cumulative Rate-A KVARH Lagging (peak) |
kvarh |
29 |
|
| 36 |
Previous month Cumulative Rate-B KVARH Lagging (Off Peak) |
kvarh |
30 |
|
| 37 |
Previous month Maximum Demand |
K W (M) |
31 |
|
| 38 |
Date of Previous month Maximum Demand |
Date |
32 |
|
| 39 |
Time of Previous month Maximum Demand |
Time |
33 |
|
| 40 |
Total Number of Outages |
Outages |
Outages |
|
| 41 |
Meter Number |
Meter Number |
Meter No |
|
| 42 |
Current Date |
Current Date |
Date |
|
| 43 |
Current Time |
Current Time |
Time |
|